Solar Electric Solutions has completed development and secured construction financing for numerous projects totaling 100 MWdc as detailed in the project list below. (Click on the project links for pictures and further project details.) We have substantial additional projects under development. Contact info@solarelectricsolutions.com for further information.
Size: 8.5 MWac
Location: Lancaster, CA
Off-Taker: Southern California Edison
Status: Construction Ready
COD: 2020
SEPV Sierra is being developed as an Energy Storage System (ESS) where batteries are charged from onsite PV. First phase of project operational in Q1 2020. Additional phases of the project in 2020 will build out to a planned 17 MWh of battery storage, which is a two hour discharge at this 8.5 MW capacity site. This innovative storage system is being deployed in conjunction with affiliated company, B2U Storage Solutions, Inc, with a superior levelized cost of storage with lower CapEx and OpEx than alternative storage systems. Visit www.b2uco.com to learn more.
Size: 2 MWac
Location: Palmdale, CA
Off-Taker: Southern California Edison
Status: In Operation
COD: 2017
SEPV Dixieland West (3 MWac) and SEPV Dixieland East (2 MWac)
Total Size: 5 MWac
Location: Imperial County, CA
Off-Taker: Imperial Irrigation District
Status: In Operation
COD: 2016
Size: 20 MWac
Location: Kern County, CA
Off-Taker: Southern California Edison
Status: In Operation
COD: 2016
Size: 2 MWac
Location: Palmdale, CA
Off-Taker: Southern California Edison
Status: In Operation
COD: 2015
Size: 12 MWac
Location: Palmdale, CA
Off-Taker: Southern California Edison
Status: In Operation
COD: 2015
SEPV Boulevard, LLC
Size: 5 MWac
Location: San Diego County, CA
Off-Taker: Southern California Edison
Status: Not Constructed
Forecasted COD: 2015
Pictures unavailable as the project was not constructed by buyer after being sold by SES.
Size: 9 MWac
Location: San Bernardino County, CA
Off-Taker: Southern California Edison
Status: In Operation
COD: 2013
Size: 12 MWac
Location: San Bernardino County, CA
Off-Taker: Southern California Edison
Status: In Operation
COD: 2013
Size: 2 MWac
Location: San Bernardino County, CA
Off-Taker: Southern California Edison
Status: In Operation
COD: 2011
Size: 2 MWac
Location: Palmdale, CA
Off-Taker: Southern California Edison
Status: In Operation